Frequently Asked Questions (FAQ)
Answers to key questions regarding our 10-Day ERP Diagnostic, VDI 2815 engineering methodology, Excel shadow-IT eradication, and unbiased client-side advisory.
1. Methodology & 10-Day Diagnostic
How is the 10-Day ERP & Operations Diagnostic structured?
The diagnostic follows a three-stage engineering protocol: Days 1–3 focus on remote master data auditing (BOMs, routings, work centers) and interface mapping. Days 4–7 take place on your shop floor: we shadow machine operators, shift supervisors, and production schedulers during live production to map physical vs. digital workflows. On Days 8–10, we calculate the quantitative variance between ERP records and shop-floor reality, delivering an executive roadmap grounded in VDI 2815.
Why does ERP Reality Check maintain strict vendor neutrality?
We accept zero referral fees, kickbacks, or commission payments from ERP software vendors (whether SAP, Microsoft, proALPHA, Infor, or others). We operate exclusively as client-side owner representatives (Bauherrenvertretung). This ensures unbiased analysis of software limitations, implementation pitfalls, and redundant licensing tiers.
Which engineering standards guide your assessments?
Our audits are grounded in German engineering standards: VDI 2815 (Selection and implementation of ERP systems) and VDI 5600 (Manufacturing Execution Systems / MES). This provides an objective, mathematical evaluation framework rather than marketing subjective claims.
2. Shop-Floor Shadow IT & Inventory Variance
What are the primary indicators of acute shadow IT in manufacturing?
Common signals include: production orders only releasing after a foreman verifies an unofficial Excel scheduling board; inventory for rush jobs being ‘reserved’ on paper notes; or shift handovers depending on USB sticks or private spreadsheets. Any recurring data silo outside the central ERP indicates dangerous shadow IT.
What is BOM drift and why does it cause phantom stock?
Bill of Materials (BOM) drift occurs when CAD design updates are not synchronized in real time with the ERP production BOM and routings. The shop floor builds according to revision B, while the ERP backflushes revision A. This creates phantom stock—materials recorded in the system that do not physically exist—causing sudden assembly standstills.
How long does it take to safely phase out Excel spreadsheets?
An abrupt shutdown causes immediate operational friction. We apply a 5-step phased migration: non-critical tracking spreadsheets are replaced with native ERP inputs or touch-screen terminals within 30 days. Complex finite scheduling spreadsheets are systematically phased out over 60 to 90 days with zero production downtime.
3. Confidentiality, NDA & Digital Toolkits
How is confidential corporate and manufacturing data protected?
Prior to any data transfer or on-site engagement, we execute a bilateral Non-Disclosure Agreement (NDA) under German law. All client datasets remain on encrypted, dedicated EU systems and are archived or purged in strict compliance with GDPR upon project completion.
What is the difference between the Free Scorecard and the €69 Toolkit?
The Manufacturing ERP Maturity Scorecard (€0) is a 15-minute diagnostic self-assessment for plant managers to evaluate baseline maturity (0–100 points). The Manufacturing ERP Reality Check Toolkit (€69) is a comprehensive master workbook containing the 45-point shadow-IT audit matrix, WIP divergence calculator, 120-criteria vendor evaluation sheet, and a 38-page implementation guide.